About
When considering rooftop solar installation services in the area, verifying local expertise in subsidy procedures is beneficial. The company services residential customers looking to integrate grid-tied solar systems onto existing rooftops. For those utilizing the PM-Surya Ghar subsidy, understanding the application timeline is important, as the process often requires timely submission following system installation. Clients should confirm the specific documentation needed, which typically includes proof of residency and necessary property ownership records, before beginning the formal application process.
Get a quote from Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation
Submit your name + phone to reveal Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation's contact and notify them. No spam, no obligation.
Rooftop solar in Faridabad, Haryana
A standard residential rooftop solar system in Faridabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Faridabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation can quote your specific roof; use the Get Quote form above or call 099999 97839.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Faridabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Faridabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation when you call (099999 97839) or fill the Get Quote form above.
What panels and inverters does Vunshika Solar Private Limited / Company in Faridabad On Grid Solar System Panel Services Installation typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Faridabad.
Location
235, Sector 10 HBC, Faridabad, Haryana 121006, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 18:00 |
|---|---|
| Monday | 09:00 – 18:00 |
| Tuesday | 09:00 – 18:00 |
| Wednesday | 09:00 – 18:00 |
| Thursday | 09:00 – 18:00 |
| Friday | 09:00 – 18:00 |
| Saturday | 09:00 – 18:00 |
