About
Visitors can expect an initial consultation regarding the feasibility of rooftop solar installations for residential and commercial properties. The service area is suitable for property owners looking to integrate solar power generation into their existing infrastructure. When considering grid connectivity, understanding the local Distribution Company (DISCOM) net-metering process is a primary consideration for potential clients. The timeline for securing net-metering approval can vary based on the current workload and procedural requirements of the local utility provider. It is advisable for prospective customers to inquire directly about the current processing backlog at the relevant DISCOM office before finalizing system design. Consulting with the installer early in the planning phase to understand the specific documentation required by the local utility can help streamline the interconnection application process.
Get a quote from Vortex Solar Energy Pvt Ltd
Vortex Solar Energy Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Faridabad.
Rooftop solar in Faridabad, Haryana
A standard residential rooftop solar system in Faridabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Faridabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Vortex Solar Energy Pvt Ltd can quote your specific roof; use the Get Quote form above or call directly.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Faridabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Faridabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Vortex Solar Energy Pvt Ltd handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Vortex Solar Energy Pvt Ltd when you call (see contact details) or fill the Get Quote form above.
What panels and inverters does Vortex Solar Energy Pvt Ltd typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Faridabad.
Location
1496, Sainik Colony, Sector 49, Faridabad, Haryana 121001, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | Closed |
| Tuesday | Closed |
| Wednesday | Closed |
| Thursday | Closed |
| Friday | Closed |
| Saturday | Closed |