About
The solar energy market in Mathura, Uttar Pradesh, is seeing increased adoption for residential rooftop installations. Individuals and property owners interested in utilizing government incentives for solar power generation can find guidance regarding the PM-Surya Ghar subsidy program. Prospective customers should confirm the current application window, as subsidy eligibility and paperwork requirements are subject to periodic updates. To streamline the subsidy process, applicants typically need to prepare specific documentation, which often includes proof of residency, property ownership records, and necessary identity proofs. Consulting with local experts early in the planning phase helps ensure all required paperwork is gathered accurately before submitting the formal application.
Get a quote from GS SOLUTIONS ( The Solar Hub )
GS SOLUTIONS ( The Solar Hub ) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Mathura.
Rooftop solar in Mathura, Uttar Pradesh
A standard residential rooftop solar system in Mathura sizes between 1 kW and 5 kW depending on monthly consumption. Most Mathura homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. GS SOLUTIONS ( The Solar Hub ) can quote your specific roof; use the Get Quote form above or call 063951 05556.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Mathura?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Mathura?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does GS SOLUTIONS ( The Solar Hub ) handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with GS SOLUTIONS ( The Solar Hub ) when you call (063951 05556) or fill the Get Quote form above.
What panels and inverters does GS SOLUTIONS ( The Solar Hub ) typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Mathura.
Location
Sonkh Rd, near Baba Patiram Temple, Krishna Nagar, Mathura, Uttar Pradesh 281004, India
View on Google Maps →Opening hours
| Sunday | 10:00 – 18:00 |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 18:00 |
