Sunbeam Solar Energy Systems Pvt Ltd

Rooftop solar installer in Mathura, Uttar Pradesh. ★ 4.9 (61 Google reviews) Updated August 2026.

About

The climate and energy consumption patterns in Mathura, Uttar Pradesh, make rooftop solar installations a viable option for both residential and small commercial properties seeking to reduce reliance on grid electricity. Homeowners and businesses in the area often benefit from solar power due to consistent daytime energy needs. When considering grid integration, understanding the local distribution company's (DISCOM) net-metering process is important. Applicants should anticipate that the timeline for DISCOM approval and final connection can vary. It is advisable for prospective customers to confirm the current procedural requirements directly with the local utility office before finalizing system sizing. Furthermore, while the process is managed by the DISCOM, having all property documentation, including ownership proof and sanctioned load details, prepared in advance can help streamline the initial application submission.

Get a quote from Sunbeam Solar Energy Systems Pvt Ltd

Sunbeam Solar Energy Systems Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Mathura.

Rooftop solar in Mathura, Uttar Pradesh

A standard residential rooftop solar system in Mathura sizes between 1 kW and 5 kW depending on monthly consumption. Most Mathura homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sunbeam Solar Energy Systems Pvt Ltd can quote your specific roof; use the Get Quote form above or call 083940 85868.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Mathura?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Mathura?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Sunbeam Solar Energy Systems Pvt Ltd handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sunbeam Solar Energy Systems Pvt Ltd when you call (083940 85868) or fill the Get Quote form above.

What panels and inverters does Sunbeam Solar Energy Systems Pvt Ltd typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Mathura.

Location

18 Tej Nagar, Maholi Rd, Chaudhary Digamber Singh Nagar, Mathura, Uttar Pradesh 281001, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 18:00
Tuesday10:00 – 18:00
Wednesday10:00 – 18:00
Thursday10:00 – 18:00
Friday10:00 – 18:00
Saturday10:00 – 18:00
Chat with us