Solar Installers in Mathura

10 verified rooftop solar installers in Mathura, Uttar Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated July 2026.

Gm Solar Corporation

★ 5.0 (24)

Infront of ICAI, near Moti Manzil, Radhika Vihar, Mathura, Uttar Pradesh 281001, India

LB solar

★ 5.0 (15)

Ground floor, Likhi Plaza, Near, Mandi Chauraha, beside OLA dealership, Radhika Vihar, Mathura, Uttar Pradesh 281001, India

GS SOLUTIONS ( The Solar Hub )

★ 4.9 (141)

Sonkh Rd, near Baba Patiram Temple, Krishna Nagar, Mathura, Uttar Pradesh 281004, India

Hare Krsna Solar Enterprises

★ 4.9 (26)

Link Rd, opposite Shri Radha Puram, near Janam Bhoomi, Gopalpur Gaon, Pooja Enclave, Shashtri Nagar, Mathura, Uttar Pradesh 281001, India

SHRIRAM SOLAR SYSTEMS

★ 3.9 (7)

92 , Madhuvan Enclave, Dwarka Enclave, Krishna Nagar, Mathura, Uttar Pradesh 281001, India

Frequently asked questions

Which is the best rooftop solar installer in Mathura?

"Best" depends on your roof size and budget — but a workable shortlist is the top 3 installers above by Google rating and review count, then ask each for a written quote covering panel make (Tier-1 only), inverter brand, structure type, BoS, and warranty terms. Verified phone numbers above let you call directly; reputable installers will do a free site survey in Mathura before pricing.

How much does rooftop solar cost in Mathura?

A 3kW residential system in Mathura typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Uttar Pradesh tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Uttar Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Mathura, mostly waiting on DISCOM net-meter approval.

Can I get a loan or EMI for rooftop solar in Mathura?

Yes. Most public-sector banks (SBI, Canara, BoB) and several NBFCs offer solar loans covering 80-90% of system cost at 8-11% interest, 5-7 year tenure. Many installers in Mathura also have tie-ups with financing partners and can process the loan alongside the PM-Surya Ghar subsidy paperwork. Ask the installer to quote both cash and EMI prices.

Related

Chat with us