SUNSHINE SOLAR SERVICES AGRA

Rooftop solar installer in Agra, Uttar Pradesh. ★ 4.8 (21 Google reviews) Updated June 2026.

About

The solar energy market in Agra, Uttar Pradesh, is seeing increased adoption for residential and commercial rooftop installations. Homeowners and businesses looking to integrate solar power into their existing infrastructure often require guidance regarding local grid connectivity. Customers in this area typically benefit from installations designed to maximize self-consumption while adhering to local utility guidelines. Understanding the process for DISCOM net-metering applications is a key consideration for new solar adopters. The local utility's processing time for these applications can vary, making timely documentation crucial for project timelines. Consulting with local experts can help navigate the specific requirements needed to ensure the system connects smoothly to the regional grid.

Get a quote from SUNSHINE SOLAR SERVICES AGRA

Submit your name + phone to reveal SUNSHINE SOLAR SERVICES AGRA's contact and notify them. No spam, no obligation.

Rooftop solar in Agra, Uttar Pradesh

A standard residential rooftop solar system in Agra sizes between 1 kW and 5 kW depending on monthly consumption. Most Agra homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SUNSHINE SOLAR SERVICES AGRA can quote your specific roof; use the Get Quote form above or call 094576 56447.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Agra?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Agra?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does SUNSHINE SOLAR SERVICES AGRA handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SUNSHINE SOLAR SERVICES AGRA when you call (094576 56447) or fill the Get Quote form above.

What panels and inverters does SUNSHINE SOLAR SERVICES AGRA typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Agra.

Location

F 64, UPSIDC INDUSTRIAL AREA SITE C, Sikandra, Agra, Uttar Pradesh 282007, India

View on Google Maps →

Opening hours

Sunday10:00 – 17:00
Monday09:00 – 18:00
Tuesday10:00 – 17:00
Wednesday10:00 – 17:00
Thursday10:00 – 17:00
Friday10:00 – 17:00
Saturday10:00 – 17:00
Chat with us