About
Homeowners interested in installing rooftop solar systems often visit this facility. For those navigating the PM-Surya Ghar subsidy process, understanding the application timeline is important. Generally, the initial steps involve registering on the designated government portal to receive an application ID. When preparing for the subsidy application, customers should confirm the required documentation before visiting. Typically, this includes proof of residence, property ownership documents, and valid identity proofs for all occupants. It is advisable to verify the latest document checklist directly through the official portal, as requirements can change. The process often requires coordination between the installer and the central subsidy portal. Having all necessary paperwork organized beforehand helps streamline the submission of the final application package.
Get a quote from Bharat Solar
Submit your name + phone to reveal Bharat Solar's contact and notify them. No spam, no obligation.
Rooftop solar in Faridabad, Haryana
A standard residential rooftop solar system in Faridabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Faridabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Bharat Solar can quote your specific roof; use the Get Quote form above or call 098104 35568.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Faridabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Faridabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Bharat Solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Bharat Solar when you call (098104 35568) or fill the Get Quote form above.
What panels and inverters does Bharat Solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Faridabad.
Location
F-28, DLF CENTRE POINT , SECTOR 11, MATHURA ROAD, Sector 11C, Faridabad, Haryana 121006, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 18:00 |
