About
Visitors can expect an initial consultation regarding the feasibility of rooftop solar installations for residential properties in the Faridabad area. The company services homeowners interested in integrating solar power generation onto existing rooftops. For those pursuing the PM-Surya Ghar subsidy, understanding the application timeline is important. The process generally requires coordination between the homeowner, the installer, and the relevant state portal. It is advisable to confirm the current eligibility window for the subsidy, as guidelines are subject to change. When preparing for the subsidy application, bringing necessary documentation is crucial for a smooth initial submission. Typically, required items include proof of residence, ownership documents for the property, and valid identity proofs for all occupants. Consulting with the team early in the process to verify the exact document checklist specific to the current subsidy round can prevent delays.
Get a quote from SN Solar Energy
SN Solar Energy hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Faridabad.
Rooftop solar in Faridabad, Haryana
A standard residential rooftop solar system in Faridabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Faridabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SN Solar Energy can quote your specific roof; use the Get Quote form above or call 099103 35892.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Faridabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Faridabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SN Solar Energy handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SN Solar Energy when you call (099103 35892) or fill the Get Quote form above.
What panels and inverters does SN Solar Energy typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Faridabad.
Location
C8HV+4PJ, Wazirpur Rd, Jeevan Nagar, Sector 87, Neharpar Faridabad, Faridabad, Haryana 121014, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:00 – 18:30 |
| Tuesday | 09:00 – 18:30 |
| Wednesday | 09:00 – 18:30 |
| Thursday | 09:00 – 18:30 |
| Friday | 09:00 – 18:30 |
| Saturday | 09:00 – 18:30 |
