About
A first visit to the facility allows potential customers to review the range of equipment and discuss system requirements with technical staff. The expertise available at this location is suitable for homeowners and small commercial entities in the Patna area seeking grid-tied solar solutions. When determining the appropriate inverter, the team assesses the specific load profile of the property to ensure the selected unit matches the energy demands accurately. Regarding system longevity, the company provides documentation detailing the warranty coverage for installed components. This coverage outlines the manufacturer's guarantees for the inverter and associated hardware. Furthermore, the service agreement includes provisions for on-site replacement should a covered component fail, providing a defined process for maintenance and repair. Clients can expect a review of the warranty terms, which specify the duration and scope of coverage for both the hardware and the installation workmanship. This structured approach to post-installation
Get a quote from Solar Energy Systems
Submit your name + phone to reveal Solar Energy Systems's contact and notify them. No spam, no obligation.
Rooftop solar in Patna, Bihar
A standard residential rooftop solar system in Patna sizes between 1 kW and 5 kW depending on monthly consumption. Most Patna homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar Energy Systems can quote your specific roof; use the Get Quote form above or call 094305 59435.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Patna?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Bihar residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Patna?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Bihar is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Solar Energy Systems handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar Energy Systems when you call (094305 59435) or fill the Get Quote form above.
What panels and inverters does Solar Energy Systems typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Patna.
Location
Shop No G-18, Umang Palace, Windsor Complex, Exhibition Rd, Hotel, Fraser Road Area, Patna, Bihar 800001, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 11:01 – 21:00 |
| Tuesday | 11:01 – 21:00 |
| Wednesday | 11:01 – 21:00 |
| Thursday | 11:01 – 21:00 |
| Friday | 11:01 – 21:00 |
| Saturday | 11:01 – 21:00 |
